We’ve gone solar

Good news, the solar panels are in position and ready to be connected. Jan and Simon have been busy for 2 days knocking up a frame and positioning the panels. Apart from forgetting to put the gaskets in, all went well. Meanwhile I finally finished the shower floors whihch have become a labour of love. The showers are designed to be wetrooms and so the floor slopes to one point. They will be clad with corrugate and have a rubber floor.

Leave a Reply